Ascot Premier Gold Mine

Premier Mine- Stewart BC

2021
Industry Mining
Services Utilized: Aggregate crushing, screening & washing
Production: Crush 100,000 + tonnes of various products for new mine startup
Client: Ascot Mining – JDS Resource
Kode was hired through JDS to perform crushing services for various materials during the re construction of Premier Gold mine
Achievements
Kode was able to meet production requirements with small foot print area
Worked with engineering group on specification alternatives
Challenges
Mountainous Terrain and heavy snowfalls
Various feed materials from Old Ore Piles
Small area and footprint